Rate per sq.ft built-up · Hyderabad 2026

Four packages. Brands named in writing.

Each package is a starting point: cement, steel, fittings, doors, windows, paint and flooring allowances are named, and any item can be upgraded. Tap "+" on a row to see what it includes.

Compare side by side

Choose your package

Indicative rates — final price fixed after drawings and soil test. Prices exclude GST; GST extra as applicable. Rates are per sq.ft of built-up area (all floors). Your final price is fixed in the agreement, based on your drawings and the specification you choose. Site extras such as rock, borewell, sump and approval fees are not included — see the hidden costs checklist.

In every package

What is included, and what is quoted separately

Included in every package

  • Design and drawingsFloor plans, sections, elevations, 3D elevation, electrical and plumbing drawings.
  • Structural designDesigned in-house in ETABS to Indian codes, with reinforcement details.
  • Approvals supportDrawings and technical certificates for GHMC / HMDA permission on BuildNow. Government fees are paid by you.
  • A site engineerResponsible for your site from foundation to handover.
  • Quality checks at every stageSteel before every pour, cube tests, ponding tests, finishing checks.
  • Anti-termite treatmentAt foundation and plinth level, before flooring.

Quoted separately

These depend on your design and choices, so we price them in writing once you decide.

  • Modular kitchen
  • Wardrobes
  • False ceiling
  • Lift
  • Compound wall
  • Elevation cladding
  • Borewell
  • Solar
  • Landscaping
Typical ranges for site extras

At a glance

Key specifications

From our customer booklet. Scroll sideways on a phone.

Key specifications by package (draft)
SpecificationBasicStandardPremiumLuxury
Rate per sq.ft (indicative)₹2,000 – ₹2,200₹2,300 – ₹2,600₹2,700 – ₹3,200₹3,900 – ₹5,000+
CementDalmia, Zuari, BharathiDalmia, Zuari, BharathiUltraTech, ACC, RamcoUltraTech, ACC, Ramco
TMT steelPrimary Fe500DVizag, JSW, SAILVizag, JSW, SAILTata Tiscon, JSW Neosteel
Living-room flooring allowanceup to ₹50 / sq.ftup to ₹100 / sq.ftup to ₹140 / sq.ft, marble allowed₹160+ / sq.ft, Italian marble option
Main doorFlush door with veneerTeak, up to ₹30,000Teak, up to ₹40,000Teak, ₹50,000+
Internal doorsFlush / membraneFlush / membraneLaminate flush, WPC in bathroomsPremium laminate, WPC in bathrooms
WindowsAluminium slidingUPVCUPVC (premium brand)Premium UPVC or slim aluminium
Sanitary and CP fittingsHindwareParryware / CeraJaquarKohler / Grohe
Interior paintTractor EmulsionTractor ShyneApcolite PremiumRoyale Luxury
Exterior paintAceApexApexApex Ultima

Indicative rates — final price fixed after drawings and soil test. Prices exclude GST; GST extra as applicable. Brands and allowances are confirmed in your specification sheet.

Draft · G+1 example

How you pay

Stage-wise, only after each stage is complete and checked by our engineer.

See the full process
Typical stage-wise payment schedule for a G+1 home
Stage (completed and checked)% of contract
Booking / agreement signing10%
Foundation and plinth complete15%
Ground floor roof slab cast10%
First floor roof slab cast10%
Brickwork / blockwork complete10%
Plastering complete10%
Flooring and tiling complete10%
Painting, fittings and fixtures (finishing)20%
Handover (after snag rectification)5%
Total100%

Typical schedule — the exact percentages are written in your agreement. Slab stages are added or removed for other floor counts so the total stays at 100%; the exact split is fixed in your agreement.

Not sure which package fits? Ask the engineer.